Grid connections take 5 to 7 years. Find out why behind-the-meter and microgrids are becoming a strategic choice for industrial companies and data centres.
Data centres are no longer passive power consumers. Discover how throttling, time-shifting and AI control are turning them into flexible assets within the energy system.
Long-duration energy storage (LDES) is key to a flexible, future-proof energy system. The technology is ready, but policy, market design, and infrastructure still slow large-scale adoption. Discover ...
Discover Europe’s largest mobile climate chamber at Sirris. Test and validate large and heavy machines under extreme climatic conditions, from Arctic cold to desert heat.
The energy sector is increasingly affected by real cyber threats, making swift action and compliance with EU regulations such as NIS2 and the Cyber Resilience Act crucial to protecting systems.
Discover thermal energy storage (TES) solutions ready for integration. Featuring innovations like crushed rock storage, molten salt systems, Fluidized sand bed technology and concentrate solar thermal ...